Cost/Price Schedules
Cost/Price Schedules associate country and currency information to things such as Part prices, Service Contracts, and Price Books. At least one active Price Schedule must be setup for billing.
Steps:
-
To navigate to Cost/Price Schedules-Settings, on the left pane menu, click
Settings and then under
Billing Settings, click
Cost/Price Schedules.
-
To export the listing grid display results, click Export to Excel button and then save the Excel file to desired location.
-
To filter the search results, in the search bar, type the keyword and then click Search button.
-
To clear the filter results/search results, beside Search field, click Clear button.
-
To create a new filter:
-
In the Search bar, type the keyword to display search results in the listing grid.
-
Click Filter button and then in the dropdown menu, Click New Filter button.
-
In the text field, enter the filter name and then click Save Filter.
-
To delete existing filter:
-
Click Filter button and then from the dropdown menu, select the filter that you want to delete.
-
Click Delete Filter button.
-
To create a new Cost/Price Schedule:
-
On the toolbar, click
Add New button.
-
In the snippet, and from the Country dropdown list, select desired country.
-
In the Schedule Name* and Schedule Description fields, enter the name and description details for Cost/Price Schedule.
-
From the Schedule Type and Schedule Currency* dropdown lists, select appropriate options as per your requirement.
-
In the Start Date* and End Date* fields, enter the desired time so that the cost/price schedule will be valid for the respective duration.
-
If you want to activate the cost/price schedule, then enable Active.
-
To display the cost/price schedule in lookup dropdown list for Part Orders, enable Display in Part Orders.
-
To display the cost/price schedule in lookup dropdown list for Contracts, enable Display in Contracts.
-
To display the cost/price schedule in lookup dropdown list for Sales, enable Display in Sales.
-
Click
Save.
-
To edit an existing Cost/Price Schedule:
-
From the Cost/Price Schedule-listing grid, select the desired Cost/Price Schedule that you want to edit and then, on the toolbar, click
Edit.
-
In the Cost/Price Schedule snippet, edit the desired details and then click
Save.
-
To delete an existing Cost/Price Schedule:
-
From the Cost/Price Schedule-listing grid, select the desired Cost/Price Schedule that you want to delete and then, on the toolbar, click
Delete